Use of track and switch tamping machines in the ÖBB route network

Track and switch tamping machines for the ÖBB route network

Bahnbau Wels has been using track construction machines acrossthe entire ÖBB network for decades and carries out track tamping and straightening work, switch tamping and straightening as well as ballast levelling and ballast bed stabilisation. The contract is based on framework agreements.

Gleis- und Weichenstopfmaschine 09-8x4 4 S Dynamic E³

Use of track and switch tamping machines in the ÖBB route network

Client:

ÖBB Infrastruktur AG

Location:

ÖBB route network in Austria

Construction period:

on-going

Executing companies:

Bahnbau Wels GmbH (in consortium)

 

Our contract

  • Tamping, levelling and compacting work on new tracks and switches
  • Maintenance work on tracks and switches
  • Single fault corrections

 