Homepage
References
Use of track-laying cranes in the ÖBB route network

Track-laying cranes on the ÖBB route network

Bahnbau Wels has been using track-bound 150t cranes on the ÖBB (Austrian Federal Railways) route network for more than a decade for track and switch conversions, bridge construction as well as for recovery and emergency services. The contracts are managed through framework agreements.

5_ Kirow KRC 1200

Use of track-laying cranes in the ÖBB route network

Client:

ÖBB Infrastruktur AG

Location:

ÖBB route network in Austria

Construction period:

on-going

Executing companies:

Bahnbau Wels GmbH (in consortium)

 

Our contract

  • Transporting pre-assembled track panels and switch parts
  • Transporting construction and precast concrete elements
  • Placement and removal of catenary masts
  • Relocation of prefabricated switch rooms near the track, platform roofs, ...
  • Recovery and emergency service
Contact