The «lessons learned» from the FbE18 Mellingen project were taken into account and implementation processes were further optimised. The framework conditions with regard to intervals, conversion procedures and accessibility were ideal in this project.
The following use cases on the subject of digitalisation and BIM were commissioned:
- 3D modelling incl. collision check and coordination
- 4D and 5D model Construction site planning and cost model
- Digital construction site management (including defect management) and BIM2Field use
- Fiel2BIM (data feedback into the model)
- As-built model and transfer to SBB databases
Technical Data
Project perimeter: Track Z 3; 370 m / Track Z 4; 372 m / Track Z 5; 333 m / Track Z 6; 334 m Total length 1,428 m
Special Features
Collaboration in the development of the BIM methodology in the area of carriageways
Our Solutions
- Inventory with 3D scan
- BIM as-built model for railway technology
- Planning and modelling phase of construction project (railway technology)
- Construction process and logistics simulations
- Data preparation for 4D machine control and construction surveying
- Feedback of the survey data into the model
Partner Company
Amberg Engineering