Feldschlösschen Rheinfelden
Client: |
Feldschlösschen Supply Company AG |
Location: |
Rheinfelden, Switzerland |
Construction period: |
08/2018 - 03/2019 |
Executing companies: |
Sersa Group AG (Schweiz), Sersa Technik AG, Tozzo AG |
Project Description
Renewal of concrete track with grooved rails incl. underfloor switches
Features
Public through traffic had to be maintained at all times, as did the transport logistics of the client. Grooved rails were pre-bent beforehand and tied into 15m long track yokes. Velostrail panels were laid in the area of the through road.
Technical Data
3 underfloor switches
430 m grooved rail track PH 37 incl. drainage boxes
150 m Velostrail