Homepage
References
Rosshäuserntunnel

Rosshäuserntunnel

This new double line Rosshäusern tunnel was built between Bern and Neuenburg.

ZOKA Rosshäuserntunnel

Rosshäuserntunnel

Client:BLS / consortium Rosshäuserntunnel
Location:Switzerland
Construction period:2017 - 2018
Executing companies:RS safetec

This project forms part of the High Speed Line (HSL) connections that will improve connections between Switzerland and the rest of the European High Speed network. This 2 km long new tunnel construction will help reduce the travel time between Bern and Paris.

The contract for this construction phase was awarded in September 2015 to the RS Rosshäusern tunnel Joint Venture (ARGE RS Rosshäuserntunnel – part of the Rhomberg Sersa Rail Group) by the BLS railway (Bern-Lötschberg-Siplon railway).

RK safetec was awarded the contract for installing the access, positioning, communication and alarm systems. All equipment were successfully installed and fully operational by May 2017.

Our responsibilities

  • 6 Tunnel cabinets
  • 5 RFID Readers
  • Large WLAN area
  • 2 Emergency telephones
  • 1 Air quality measurement station