Our focus was on transferring data from the BIM models to the construction machinery. Furthermore, model-based collaboration on the CDE project was regulated and implemented with all project participants during the execution phase.
Technical Data
- Total track length 450 m
- Switches 6 pcs.
- Cable duct (type T11, T23) 250 m
- Track crossings 2 pcs.
- Cable ducts 6 pcs.
- Total excavation volume 2'500 m3
Special Features
- The first BIM pilot project in the field of track renewal at SBB
- Digital construction site management
- Utilising machine data and feeding it back into the BIM model
- Definition of use cases together with the customer
Our Solutions
- Data preparation for 3D machine control and construction surveying