Cologne/Rhine-Main Lot C
Client: |
Walter-Heilit-Verkehrswegebau GmbH |
Location: | Germany |
Construction period: |
09/2000 - 6/2001 |
Executing Companies: | Rhomberg Bahntechnik GmbH (in consortium with Bahnbau Wels GmbH) |
Contract Value: |
2,30 Mio EUR |
We conducted this project as subcontractor for WalterHeilitVerkehrswegebau (a member of a superior consortium).
- GRPnetwork with fixed points on the track trough
- Rough and fine track adjustment
- High precision adjustment and fixation of approx. 42 kms of track
- Documentation of alignment data before casting concrete
- Network equalisation/postprocessing of alignment data
- Cast 23 km (incl. 4.2 km in tunnel) concrete using an inhouse developed concrete pouring machine / controlled releasing of the fixed track on top of the freshly cast concrete
- Postalignment and documentation of the nominal/actual value comparison of the finished track
- Develop our own adjustment/fixation system using temporary rails