At Rhomberg Sersa Rail Group, we have the experience and expertise to carry out even the most complex of projects. Plus, our flexible machine park is perfectly suited to any project requirement.
Modernising railway tunnels also includes replacing ballast tracks with slab tracks.
What we can do for you:
- Tunnel vault renovation
- Tunnel vault replacement
- Tunnel vault reinforcement
- Tunnel vault-drainage
- Light expansion
- Bed Lowering
- Renewing tunnel drainage systems
- Renewal cabling
- Track renewal
- Track replacement, installation slab track
- Installing safety lighting
- Installing LED-handrails
References
Contact